Friday 3 February 2012

winter work


Now at the start of February, with the top six inches of the greens frozen and the golfing surfaces exhibiting firmer playing characteristics than the M25, the green-staff are mostly confined to barracks.

The residual effect of all our woodland management and tree work of the last month is that we now have enough logs to heat the Clubhouse in the winter months for AT LEAST the next couple of years.


In the workshop Terry Redwood, our Director of Machinery (Maintenance, Servicing and Engineering) and his senior assistant Mike Williams (pictured) are today ably assisted by Kev Glazier to cover the extensive workload of winter overhauls at this time of year.





No comments:

Post a Comment

Note: only a member of this blog may post a comment.