Monday 22 July 2013

JHT front-nine reconstruction *PROGRESS*


JHT 1st green area with drainage pipes installed and backfilled

With the longest period of warm and dry weather for several years, MJAbbott are making good progress. Whilst badger habitats frustrate their efforts on four-greens elsewhere greens, bunkers and greens-surrounds are shaped in the subsoil; piped drains are installed to carry water away to soakaways and the greens are ready for the gravel carpet to be spread.  
mini-excavators finishing-off drainage trenches

At the JHT 3rd the outline shape of the left greenside bunker is clear to see, the limits of the green are cut into the subsoil and the shaping to proposed and surveyed levels is ready for inspection by Martin Ebert, the course architect. 

JHT 3rd looking from the front left of the working area


The greens are built from the sub-base up.  As different layers are installed from the base, the stone-carpet and the rootzone all replicate the topography and elevation-changes shaped in the sub-base and signed-off as designed by the course architect.
JHT 7th with the stone-carpet installed

At the JHT 8th the new teeing ground, the wetlands, the green and green-surrounds are all progressing well.  The tee is level and drained, capturing the final design of the wetlands is still a bit of a moving target and the green-area is signed-off at a similar stage to the 7th green area.    

view from the new, elevated JHT 8th teeing ground



The creation of the wetlands - and the provision of a habitat for aquatic plants around the margins - is proving a little testing.  The irregular shapes through the base of, 'Ray's Ravine,' - or, 'Peter's Fjord,' - or perhaps, 'Ebert's Abyss,'  should encourage water;
  • to be held and meander through the depths of the gulch
  • seasonally moisten the margins as levels rise and fall with high-tides
  • tap into the naturally occurring water-table at about 1.8-metres
  • drain and capture the surface run off during autumn and winter from the top part of the course up the hill beyond the JHT 7th and PBarton 5th   